Find Vendors, Products, and Services
Keysource, the data centre design specialist, has completed its role to deliver principal design consultancy to Teesside University for its challenging new data centre upgrade project.
Keysource’s design on this complex project, which recently received planning permission, will see the University’s data centre benefit from a new critical power generator. This will ensure it has an uninterruptable power supply as well as a highly resilient modular UPS which can be expanded in response to changing requirements. It also utilises an innovative fresh-air cooling system that will make full use of the low-ambient temperatures around the data centre.
The full scope of Keysource’s consultancy contract was to conduct an initial feasibility study identifying any issues and risks, and address them. Designs were then developed for critical power and air quality. Keysource also assisted with the planning submission and took responsibility for the procurement of contractors and suppliers, taking the role of CDM principal designer.
There were several major risks that needed to be ironed out in the design process due to the data centre’s location. The University is flanked by an estuary and in close proximity to the sea. This means that the atmosphere around the data centre could be potentially challenging for both the IT and M&E infrastructure, with corrosion being a risk needing to be factored into the design. In addition, as the data centre is in the heart of Middlesbrough where the surrounding area is host to a large number of industries, there is the usual threat from external contaminants.
Keysource had to take into account noise control and all modifications also had to meet strict planning requirements.
Andrew Maclaren, Assistant Director (Estates Services & Energy Procurement) at Teesside University said, “We chose Keysource through the North East Universities Purchasing Consortium (NEUPC) framework. We wanted totally independent data centre design specialists with experience in both fresh air cooling as well as working within the education sector. Keysource has professionally met every requirement and we’re really pleased with their designs and guidance on sourcing the best solutions for our needs.”
Andy Hayes, Director at Keysource added, “We have a number of Higher Education providers within our portfolio and are well versed in the challenges the sector faces particularly around the need for flexibility and the budgetary constraints. We were able to complete this project on time and on budget and our innovative design will ensure the data centre meets Teesside University’s IT requirements for many years to come.”
Welcome to
The Data Center Vendor Database
© 2024 Created by DataCenterProfessionals.Net. Powered by
You need to be a member of The Data Center Vendor Database to add comments!
Join The Data Center Vendor Database